Are you thinking of installing a water well in Norfolk, MA. This article is geared towards understanding Norfolk MA Board of Health Regulations. Understanding your town regulations can be instrumental in compiling total project costs when it comes to drilling a water well in Norfolk, MA. 1. Permit Info: Well construction permit fee: $200.00 Separate $25.00 Administrative fee made out to the Town of Norfolk 2. Well Location: A plot plan shall be submitted with the application for a well permit to the Board of Health indicating the proposed location of the well, all buildings, boundary lines, septic systems (within 200 feet). Minimum distances include Leaching Areas □ Perc Rate Less Than 5 min/in 150 feet Perc Rate 5 to 10 min/in 125 feet Perc Rate Greater than 10 min/in 100 ...
Comments
0